MIL-V-29592(AS)
shall become a part of the contractor's overall inspection system or quality
program. The absence of any inspection requirements in the specification
shall not relieve the contractor of the responsibility of ensuring that all
products or supplies submitted to the Government for acceptance comply with
all requirements of the contract.
Sampling inspection, as part of manufacturing operations, is an acceptable
practice to ascertain conformance to requirements, however, this does not
authorize submission of known defective material, either indicated or actual,
nor does it commit the Government to accept defective material.
4.2 Classification of inspections.
The inspection requirements specified
herein are classified as follows:
First article inspection (see 4.4).
a.
b. Quality conformance inspection (see 4.5).
4.3 General. The quality assurance provisions shall be in accordance with
MIL-H-8775, and as specified herein.
4.4 First article inspection. When a first article is required (see 3.1,
6.2 and 6.3), it shall be examined as specified in 4.7.1 and tested for per-
formance as specified in 4.7.2 through 4.7.13.
4.4.1 Test samples. For first article inspection, two test specimens
shall be selected for testing. The first sample shall be subjected to all
tests and the second sample held as a back-up to confirm any failures that may
occur. The test specimens shall not have been subjected to any testing prior
to submittal, except for the individual inspections (see 4.5.1). The speci-
mens shall be assembled of parts which conform to manufacturer's drawings and
have nominal tolerances typical in a production lot.
4.4.2 Tests. The first article tests shall consist of the tests
specified in Table I conducted in the order as specified.
4.5 Quality conformance inspections. Quality conformance inspections
shall consist of the following:
a.
Individual inspection (see 4.5.1)
b. Sampling tests (see 4.5.2)
4.5.1 Individual inspections. The individual inspection shall consist of
the following:
Examination of product (see 4.7.1)
a.
b. Proof pressure (see 4.7.3)
Functional (see 4.7.4)
c.
d. Reverse air flow (see 4.7.6)